I cut out the 2nd rail on the Right Detector Stack. It was under a little tension and I had a small problem. There was a pretty good bit of metal filings generated. I got most of it cleaned up. But, I need to get up there with a decent vacuum and brush. Probably tomorrow. Till then it is OK to use the two electronics platforms, but stay off the side I-beams and the rear of the stack. Thanks.