    User name glorioso (Tech)

    Log entry time 09:27:37 on March 18, 2014

    Entry number 386959

    Followups:

    keyword=Hall A Checklist

    A limited checklist that does not include the spectrometers is complete

    Beam line valves operational checked per Rick Gonzalez

    Beam line valves from Compton to the dump are operational

    The target, spectrometer entrance, spectrometer exit and VDC covers remain installed

    Angle limits for the left HRS is 15 degrees and locked.

    Angle limits for the right HRS is 33 degrees and locked.

    The left and right snout collimators have been removed. Collimators are in the sieve position.

    Both HRS spectrometers are down for troubleshooting of power supplies (inquiries contact Jack Segal)

    There appears to be a solid target in the beam position

    Tech on call is Jessie Butler.