The LQ1 and the LD1 both tripped due to problems with cryo. We left them alone for a while to avoid having them just trip off again. Eventually Heidi, Andrew, and Jason came down to adjust the lead flows and see if we might get things a little more stable for the evening. Julie turned the software regulators back on and the magnets are ramping back up to 1 GeV. Everything seems OK. RQ1 is still turned off.