    User name brash

    Log entry time 15:59:20 on March26,2014

    Entry number 387623

    keyword=Shift Summary

    8:00am .... waiting for beam ....
    10:30am .... still waiting ....
    11:00am Installed new microwave oven in counting house! Thanks to Douglas Higinbotham!!! :)
    11:17am Target alarms ... see HALOG entry for more details. Looks like one of the temperature probes may be bad. Working with Greg Smith.
    1:00pm Called MCC ... still doing BLM setup in the machine ... beam not anticipated until swing shift.
    1:27pm Ramp Left Arm up to 3.0GeV/c setting, to test that the left arm can get to this momentum setting without issue, in anticipation of beam during swingshift.
    3:00pm Finally got NMR to lock on LHRS
    4:00pm Target situation is better now ... increased fan speed (at the direction of Josh from target group) and this seemed to fix the "blip" effect
    4:00pm MCC is doing BLM setup in the Hall A line now ... beam anticipated in a "few hours".