Thursday 03/27/2014
Swing Shift Summary
================
Crew;
S.L : M. Dlamini
T.O : M. Jones
3rd : T.N. Gautam
================
Time-line;
16:00 ; Begining of shift, NO BEAM.
17:30; Hall moves to Controlled Access, Definately no beam for approximately
the next 1-2 hours.
M. Jones Changed GEM detector gas bottle the controlled access mode
Kalyan fixed T1 scalers
18:40; Everyone out of the hall, we are still in controlled access
until MCC is ready to go to beam permit.
20:00; Hall still in Controlled access
21:00; Change of Run plan by MC::: (1)Crew to start with empty
target,establish 2 micro A, check BPMs are zero within 1mm on
BPM4D and BPM4D.
(2) Establish raster, still with no target - ask for 4x4 and
with verify spot_L. Use only T8 with LHRS, ps8 = 100
(3)Put BeO and ask for 2 micro A. Switch off target camera light
and try to see beam spot. - check T1 rates, should be few KHz, NOT
MHz
(4) Centering - Call MCC to move beam up/down/left/right by about
3mm and check for spikes in the trigger rates. If rates spike,
then beam is probably hitting a frame.
(5) If satisfied with beam, then ask for 5 micro A and observe
the T1 rates. they should linearly increase with current.
==>Continue run plan with carbon target WITH NOMINAL BEAM POSITIONS
i.e +/- 1mm
22:00; Hall changed from Controlled access to beam permit
22:24; Call from MCC crew chief. MCC working on Optics to get beam to
hall. We probably won't be getting beam tonight.
Target very well behaved tonight!!!!
00:00; End of shift, No beam
NOTE
======
1. Tech On-call, Heidi, can only be accessed on the 349-3460