Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name fansler
Log entry time 11:16:09 on March 28, 2014
Entry number 387878
keyword=Cryo warm return
The cryo group would like to switch our warm returns to ESR suction. The
switch may cause our lead flows to drop below trip point, so we are
ramping down our power supplies. Jessie will coordinate with the cryo group.
A copy of this log entry has been emailed to: segal@jlab.org, folts@jlab.org