• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name H Ibrahim

    Log entry time 16:03:24 on March29,2014

    Entry number 387996

    keyword=Day Shift Summary


    Saturday 03/29/2014
    Day Shift Summary
    ================

    S.L : H. Ibrahim
    T.O : M. Jones

    ================

    08:00- Start of shift, No Beam, Waiting to get CW beam anytime.
    08:35- MCC called. They will try to deliver a low CW beam.
    10:00- Changed collimators from seive to 6msr on both arms.
    12:00- Taking mixed cosmic and beam data with empty target.
    03:30- RC says no beam this weakend higher than 2 uA.
    04:00- End of shift

    Summary of Runs:

    L 1297: 291k
    R 20306: 572k
    L 1298: 4.9M (Many scatterings from the beam!)
    R 20307: 4.3M (Many scatterings from the beam!)
    L 1299: Runing at the end of shift
    R 20308: Runing at the end of shift