Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name H Ibrahim
Log entry time 16:03:24 on March29,2014
Entry number 387996
keyword=Day Shift Summary
Saturday 03/29/2014
Day Shift Summary
================
S.L : H. Ibrahim
T.O : M. Jones
================
08:00- Start of shift, No Beam, Waiting to get CW beam anytime.
08:35- MCC called. They will try to deliver a low CW beam.
10:00- Changed collimators from seive to 6msr on both arms.
12:00- Taking mixed cosmic and beam data with empty target.
03:30- RC says no beam this weakend higher than 2 uA.
04:00- End of shift
Summary of Runs:
L 1297: 291k
R 20306: 572k
L 1298: 4.9M (Many scatterings from the beam!)
R 20307: 4.3M (Many scatterings from the beam!)
L 1299: Runing at the end of shift
R 20308: Runing at the end of shift