• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name E. Christy

    Log entry time 20:01:38 on March29,2014

    Entry number 388018

    keyword=beam position with BeO

    Checking beam position with BeO. Spot looks to be a few mm high so we have MCC to move the beam down by 3mm. The HRSL T1 rate is ~1kz at 2uA before move.

    After move, the beam looks reasonably centered so we are now going back to empty target 2.

    Empty target 2 rates are still ~1.8kz. We are now moving to empty target 1.

    After move to empty target 1 the rate is still ~1.5kz.