Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name E. Christy
Log entry time 20:01:38 on March29,2014
Entry number 388018
keyword=beam position with BeO
Checking beam position with BeO. Spot looks to be a few mm high so we have MCC to move the beam down by 3mm. The HRSL T1 rate is ~1kz at 2uA before move.
After move, the beam looks reasonably centered so we are now going back to empty target 2.
Empty target 2 rates are still ~1.8kz. We are now moving to empty target 1.
After move to empty target 1 the rate is still ~1.5kz.