    User name E. Christy

    Log entry time 00:26:45 on March30,2014

    Entry number 388080

    keyword=Swing shift summary


    SL: E. Christy
    TO: T. Gautam
    RC: C. Munoz
    ================


    17:00 - 18:30 no beam
    16:30 - 20:00 beam centering
    Found beam in reasonable position on BeO, but HRSL rates on empty target indicated
    that the beam was hitting the target frame. Eventually eliminated the rate after moving the beam +4mm vertically. Spent most of the rest of the shift trying to refine the beam positioning using the carbon hole target.

    Found the beam to be centered on the carbon hole for bpm A positions of (0mm, 3mm).