• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Hall A Techs

    Log entry time 17:11:14 on November 12, 2014

    Entry number 403947

    keyword=Checklist

    "Checklist complete and target window and spectrometer guards are removed"

    "Angle limits for the left spectrometer are 23 degrees to 23 degrees"

    "Angle limits for the right spectrometer are 67.25 degrees to 67.25 degrees"

    "The tech on call is JESSIE BUTLER"

    "Sieve Split is NOT installed on right spectrometer"

    "Right spectrometer window and VDC covers are NOT removed, see Jack for more information"

    "Right spectrometer magnets are off per jack"

    "Left collimator is in the "open" position"