Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 14:37:39 on November20,2014
Entry number 404172
keyword=Rough BCM Calibration
With stable beam around 3.9 uA, I did a rough BCM calibration for the upstream and downstream cavities. I more careful calibration needs to be done in the future.
old upstream coefficient: 42.6
old downstream coefficient: 43.8
New coefficients:
upstream = 43.17
downstream = 38.7
FIGURE 1