Log entry time 09:00:43 on October 31, 2016
Entry number 415555
keyword=End_of_Run_14208
****************************
Run Number: 14208
End of Run Comment:
Run_type=Production DVCS,target_type=15 cm LH2 top,comment_text=0uA beam currentm raster 2x3 mcc units (2x2mm), BPM X/Y= 0.8/0.6, loop2 target
wrong # args: should be "set varName ?newValue?"
while executing
"set offset(d3) - 3766.88/103700. "
(procedure "halla_scaler_process_L" line 94)
invoked from within
"halla_scaler_process_L .mid.tex scalerinfo "
****************************
End-of-run EPICS data for Run Number 14208 at Mon Oct 31 09:00:43 EDT 2016
Right and Left MLU settings
Left MLU settings
0 0xffff
time of Left HRS MLU last setting 13 at 10:20
Right MLU settings
0 0xffff
time of Right HRS MLU last setting 13 at 10:20
The meaning of the settings is documented elsewhere; briefly:
first number is 0 or 1
0 = standard GMp trigger
1 = single detector trigger
second number is a bit mask
bit=1 means output is enabled
bit=0 means output is disabled
only last 8 bits are relevant for NIM output
General Run Info
------
Beam Energy Information:
Set Beam energy (MeV) : 8518.49
Tiefenbach 6GeV Beam energy (MeV) : 8496.16
Tiefenbach 6GeV orbit correction (dpp) : 0
Injector Measured Energy : 116.414
Average North Linac Measured Energy : 1052.76533333333333
Average South Linac Measured Energy : 1048.81333333333333
MBSY1c Magnet Current : 360.107
MBSY1c Bdl : 2.1256e+06