    16:00 Start Moller test
    Put reference cell in in order to shake down shower counters
    Pressure of Nitrogen in cell is 1.1 atm
    19:30 Control access to look at heater-it looks fine
    20:00 Beam back for moller measurement
    20:20 Mark Stevens is allowed in the hall to fix air flow for target.
    He repaired the air compressor
    21:15 Spin dance is cancelled since Moller group does not understand
    asymmetry of beam in the two spin states. They suspect a problem
    with the laser our Pockels cell at the source.
    21:20 Mott measurement is done.
    22:00 Moller group decides to go ahead with the spin dance anyway
    23:30 4 points of the spin dance have been completed
    23:40 Wien filter has been adjusted to optimize polarization to Hall C
    since Hall A has not started production running yet.
    00:00 Reference cell has been taken out and an access is being made
    to asses the reference cell leaks.

    Note: during the evening CODA was crashing every other run
    not sure why.