Main INDEX
Monthly INDEX
PREV
NEXT
User name prout
Log entry time 00:46:14 on September 28,1998
Entry number 1690
keyword=Swing shift summary
16:00 Ready to make entry to Hall to fix hadron VDC Jack Segal , Bogdan
cleaned and reseated cards.
19:30 Hall closed up but Bogdan discovers a channel of the Cerenkov that requires
fixing so we reentered the hall. No sweep required since no beam has been in the
hall
21:30 Bogdan has replaced a delay line to get rid of noise on one hadron Cerenkov
channel. Also, he adds an AC filter to all channels of this Cerenkov.
22:20 A cavity is down in the accelerator. We will be down for about a half hour.
23:00 Moller tests underway along with detector tests for Bogdan. Magnets have
been set to 1.2 GeV in order to evenly illuminate all detectors. The reference cell
is in at 1.1 atm. Runs 1299-1307 are 1.2 GeV detector runs. During run 1307
the magnets were discovered to have crashed (the alarm handler was turned off
again !!??).
00:00 Moller measurements are continuing.