• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Deur A.

    Log entry time 08:23:37 on September 28,1998

    Entry number 1746

    keyword=9/28 night shift

    sum up of the night shift:
    Q1 and Q3 hadron tripped 4 times.
    Access to fix problem on Hadron Cerenkov and check the rotary system of the Moller
    at 2:30 coda was giving 100 % deadtime for 0 event. no effect in rebooting coda or the ROCs. Have to call Bob Mickael. Problem fixed at 7:30 (Bob unpluged and replug the network switch)
    check the rastering size for He3 elastic runs: ok