• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 08:09:03 on September 30, 1998

    Entry number 1953

    keyword=Beam Time Accounting
    Hall A

    9/30/1998 0000-0800
    Experiment #: E94-010
    Shift Leader: Deur A.
    Shift Workers: Kominis I., Rowntree D.

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    45 55 55 1 1 1 1 25 7
    Beam Available
    but Not in Use
    15 5 5 0 0 0 0 35 1
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    45 55 55 1 1 1 1 25 7
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 35 0.583333333333333
    Unplanned
    Experiment Down
    15 5 5 0 0 0 0 00.416666666666667
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 35 0.583333333333333
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 15 5 5 0 0 0 0 0 0.416666666666667
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 00:30 Q1 & Q2 hadron tripped. 1:30 coda crashed --> have to start it again 2H 30 Target polarization: 28 % 2:54 Q1 hadron crashed 3:00 coda crashed 4:00 coda crashed End the longitudinal runs for Ep=1.607 , E = 1.719 , Theta= 15.5 (97.04 M of events) 6:03 Target polarization: 30 % begin a empty cell run. 7 : 25 end of empty cell run, begin to switch to transverse configuration 7: 55 begin transverse run production &: 55 Q2 tripped

    Data Entry by: Deur A.