0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 30 | 60 | 25 | 50 | 60 | 60 | 45 | 60 | 6.5 |
Beam Available but Not in Use | 30 | 0 | 35 | 10 | 0 | 0 | 15 | 0 | 1.5 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 30 | 60 | 25 | 50 | 60 | 60 | 45 | 60 | 6.5 |
Planned Config- uration Change | 30 | 0 | 35 | 0 | 0 | 0 | 15 | 0 | 1.33333333333333 |
Unplanned Experiment Down | 0 | 0 | 0 | 10 | 0 | 0 | 0 | 0 | 0.166666666666667 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 0 | 0 | 0 | 10 | 0 | 0 | 0 | 0 | 0.166666666666667 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 0:00 switch to perp p6 and do nmr meas.;o:30 start p6 perp run 1546.2:25 p6 perp done with 9.6 M. did nmr meas, switched to parralel and p7. coda crash at 3:00. run1548 started at 3:10. stopped at 6:30 with 16.2 M. 6:30 nmr meas and switch to perp. 6:45 run1549 started in p7 perp.
Data Entry by: Y. R. Roblin