    Log entry time 08:06:19 on October 4, 1998

    Entry number 2290

    keyword=Beam Time Accounting
    Hall A

    10/4/1998 0000-0800
    Experiment #: E94-010
    Shift Leader: Y. R. Roblin
    Shift Workers: P. Djawotho, M. Rvachev

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    30 60 25 50 60 60 45 60 6.5
    Beam Available
    but Not in Use
    30 0 35 10 0 0 15 0 1.5
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    30 60 25 50 60 60 45 60 6.5
    Planned Config-
    uration Change
    30 0 35 0 0 0 15 0 1.33333333333333
    Unplanned
    Experiment Down
    0 0 0 10 0 0 0 00.166666666666667
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 10 0 0 0 0 0.166666666666667
    Other 0 0 0 0 0 0 0 0 0

    Comments: 0:00 switch to perp p6 and do nmr meas.;o:30 start p6 perp run 1546.2:25 p6 perp done with 9.6 M. did nmr meas, switched to parralel and p7. coda crash at 3:00. run1548 started at 3:10. stopped at 6:30 with 16.2 M. 6:30 nmr meas and switch to perp. 6:45 run1549 started in p7 perp.

    Data Entry by: Y. R. Roblin