9:05 Mott measurement done yesterday: 72.1 % +/-0.6 beam pol.
10:15 coda crashed (end-of-run crash)
10:58 NMR measurement 30% target pol.
11:00 change configuration to perpendicular runs
11:21 launch dataspy: correlation between the coda deatime peaks and the hits on the plane 3 of hadron arm VDC. correlation seen eagh time we get a peak
12:50 beam problems (injector)
12:30 beam back
12:58 end of the perpendicular runs @ P=0.782 GeV/c tot # of events: 7.9 M
NMR measurement: 28% target polarization
13:12 Begin longitudinal run @ Ep=0.666 GeV, E=1,719 GeV, theta=15.5
13:59 Beam down (Moller for Hall A and B)
14:48 Beam back
15:10, coda very slow, have to reboot the crates and adaqs2
15:27 coda back.