• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 16:03:05 on October 10, 1998

    Entry number 2557

    keyword=Beam Time Accounting
    Hall A

    10/10/1998 0800-1600
    Experiment #: E94-010
    Shift Leader: S. Incerti
    Shift Workers: M. Rvachev, B. Zhang, S. Choi

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    0 0 0 0 0 0 0 0 0
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    1 1 1 1 1 1 1 1 8
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 1 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 9:05 : Ref cell filled with N2 pumped to 70 psia 10:10 : tune beam in the hall. BeO target in place. 10:25 : MCC noticed ion chamber readouts are zero. Total dose seems to be frozen. M. Stevens called. We have no way to fix that. MCC calls its experts. Still waiting for the beam 14:20 : change momentum to 1.3 GeV

    Data Entry by: S. Incerti