0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 10 | 1 | 1 | 1 | 30 | 0 | 3.66666666666667 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Not Available or Unacceptable | 1 | 1 | 50 | 0 | 0 | 0 | 0 | 0 | 2.83333333333333 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 30 | 1 | 1.5 |
Experiment Ready | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 2:50 Start HAPPEX runs to check Charge asymmetry 3:30 happex done 3:40 BCM calibration. wrong (used the old screen + accelrator cavities tripped) 4:00 NMR: target polarization at 36 % 4:20 raster studies (Bscope + Newspot + harp scan) 5:00 BCM calibration (OK) 5:35 raster check. bad spot. have to change the raster gain 6:00 begin acceptance studies. *1360 MeV/c done (both spectrometer) *1292 MeV/c done (only electron arm: the hadron arm take too long) 6:30 accelerator shut down. 6:45 NMR measurement: 36.4%
Data Entry by: Deur A.