    Log entry time 15:56:48 on October 27, 1998

    Entry number 3849

    keyword=Beam Time Accounting
    Hall A

    10/27/1998 0800-1600
    Experiment #: E94-010
    Shift Leader: A. Duer
    Shift Workers: A. Saha, J.P. Chen, B. Zhang

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    50 5 0 0 45 1 1 45 4.41666666666667
    Beam Available
    but Not in Use
    10 55 1 1 15 0 0 15 3.58333333333333
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    50 5 0 0 45 1 1 45 4.41666666666667
    Planned Config-
    uration Change
    10 55 1 1 15 0 0 15 3.58333333333333
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 20 0 0 15 0 0 0 0.583333333333333
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 10 35 1 1 0 0 0 15 3

    Comments: 8:40 End |_ runs @ E=3.4 GeV, Ep=2.580 GeV, Theta=15.5 degree Tot # of events 27.8 M 8:43 Compton polarimeter checked the charge asymmetry prior to change the pockel cell voltage : Aq=680 ppm. 8:55 change momentum to P=2.382 GeV/c. Problem with hadron arm magnets 9:00 NMR measurement: target polarisation (transverse): 33 % 9:25 Compton checked charge asymmetry after to have change the PC cell current: -37 +/-24 ppm 9:30 BCM linearity tests + BCM calibration. Ended at 11:50 12:00 NMR: target polarisation (longitudinal) 34 % 12:20 begin \\ runs @ E=3.4 GeV, P=2.382 GeV/c 13:00 notice a light leak in the scintillators. Should not affect the data quality 13:00 pedestal run 15:15 back to // runs.

    Data Entry by: Deur A.