0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 22 | 46 | 53 | 18 | 5 | 1 | 5 | 1 | 4.48333333333333 |
Beam Available but Not in Use | 0 | 0 | 7 | 27 | 55 | 0 | 55 | 0 | 2.4 |
Beam Not Available or Unacceptable | 38 | 14 | 0 | 15 | 0 | 0 | 0 | 0 | 1.11666666666667 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 53 | 33 | 1 | 1 | 1 | 1 | 7.43333333333333 |
Planned Config- uration Change | 0 | 0 | 7 | 27 | 0 | 0 | 0 | 0 | 0.566666666666667 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 27 | 0 | 0 | 0 | 0 | 0.45 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 7 | 0 | 0 | 0 | 0 | 0 | 0.116666666666667 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 8:38 Beam down: arc power supply tripped twice MCC called a specialist. During the beam down: - NMR measurement without laser - NMR measurement with laser --> taget polarization 31 % - Pedestal run 9:46 beam back 10:53 last run in |_ configuration, E=3.4 GeV, Ep=2.199 GeV, theta=15 degree Tot # of events 17.6 M beam secured during momentum changed 11:27 beam restored. Begin // runs @ E=3.4 GeV, Ep=2.030 GeV, 15.5 degree 11:45 Beam down (PSS fault in the injector) 12:55 beam back (PSS problem not fixed but the need beam to troubleshoot it) 14:00 coda crashed 14:55 coda back.
Data Entry by: Deur A.