keyword=target work at the scattering chamber is done
The planned work at the target scattering chamber is complete:
Replaced damaged optical windows;
Installed a new polarized He3 target cell (NEPHELI);
Installed a new reference cell (it holds to above 60 psi with no obvious leak, but slow leak at 130 psi);
Checked the air flow;
Lubricated the target motion system;
All RTD's are working;
Re-checked the target positions.