    User name adaq

    Log entry time 00:12:32 on November 7, 1998

    Entry number 4756

    keyword=Beam Time Accounting
    Hall A

    11/6/1998 1600-2400
    Experiment #: E94-010
    Shift Leader: J. Gao
    Shift Workers: Z. Chai, W. Korsch, S. Malov

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0 0 0 0.2 1.0 1.0 0 0.6 2.8
    Beam Available
    but Not in Use
    0 0 0 0 0 0 1.0 0.4 1.4
    Beam Not Available
    or Unacceptable
    0 0.3 1.0 0.8 0 0 0 0 2.1
    Accelerator Con-
    figuration Chage
    1.0 0.7 0 0 0 0 0 0 1.7
    Experiment
    Ready
    0 0.5 1.0 1.0 1.0 1.0 1.0 1.0 6.5
    Planned Config-
    uration Change
    0 0.3 0 0 0 0 0 0 0.3
    Unplanned
    Experiment Down
    1.0 0.2 0 0 0 0 0 01.2
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 1.0 1.0 0.4 0.6 3
    Other 0 0 0 0 0 0 0 0 0

    Comments: Did one NMR measurement. Finished the Moller measurement. Checked the beam spot size. Did the reference cell run with collimator in. (empty cell) Finished the reference cell run with collimator out. (empty cell).

    Data Entry by: J. Gao