• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 23:58:59 on November 7, 1998

    Entry number 4858

    keyword=Beam Time Accounting
    Hall A

    11/7/1998 1600-2400
    Experiment #: E94-010
    Shift Leader: J. Gao
    Shift Workers: Z. Chai, W. Korsch, S. Malov

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    1.0 1.0 0 1.0 1.0 1.0 1.0 0.8 6.8
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0.2 0.2
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 1.0 0 0 0 0 0 1
    Experiment
    Ready
    1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 1.0 1.0 0 1.0 1.0 1.0 1.0 0.8 6.8
    Other 0 0 0 0 0 0 0 0 0

    Comments: Finished N2 run, total events 93.8 M. Did one NMR measurement on target. Checked beam spot. Took data on 3He at 5 uA for about an hour, then at 10 uA for about an hour, did the NMR measurement. Found out the polarization was 31%. Then kept taking data at 10 uA, Pe=3.352 GeV/c, Pp=3.0858 GeV/c.

    Data Entry by: J. Gao