    User name adaq

    Log entry time 08:05:18 on November 14, 1998

    Entry number 5382

    keyword=Beam Time Accounting
    Hall A

    11/13/1998 0000-0800
    Experiment #: E94-010
    Shift Leader: Deur A.
    Shift Workers: Djawoto P., Jensen S.

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    1 50 1 50 1 57 47 1 7.4
    Beam Available
    but Not in Use
    0 10 0 10 0 3 13 0 0.6
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 50 1 50 1 57 47 1 7.4
    Planned Config-
    uration Change
    0 10 0 10 0 3 13 0 0.6
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 10 0 10 0 3 13 0 0.6
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 00:30 Bscope 1:00 NMR 22% (using old calibration. The polarization should be higher) Back to longitudinal mode (same kinematic & magnets setting: E=4.3 GEV, EP_e=3.631 GeC, Ep_h = 2.636 GeV, theta=15.5 degree) 3:12 NMR measurement:23 % 5:12 NMR:24 % 6:30 NMR: 25 % (back to transverse)

    Data Entry by: Deur A.