0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 1 | 1 | 30 | 1 | 1 | 20 | 1 | 1 | 6.83333333333333 |
Beam Available but Not in Use | 0 | 0 | 30 | 0 | 0 | 40 | 0 | 0 | 1.16666666666667 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 30 | 1 | 1 | 20 | 1 | 1 | 6.83333333333333 |
Planned Config- uration Change | 0 | 0 | 30 | 0 | 0 | 40 | 0 | 0 | 1.16666666666667 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Finished acceptance study at about 5am. Spectrometer change to 1.389 GeV required about 40minutes and since 6:00 taking data possibly the last point at this beam energy.
Data Entry by: Seonho Choi