• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 08:09:46 on November 20, 1998

    Entry number 5875

    keyword=Beam Time Accounting
    Hall A

    11/20/1998 0000-0800
    Experiment #: E94-010
    Shift Leader: Seonho Choi
    Shift Workers: Pibero Djawotho, H. Tsubota

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    1 1 30 1 1 20 1 1 6.83333333333333
    Beam Available
    but Not in Use
    0 0 30 0 0 40 0 0 1.16666666666667
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 30 1 1 20 1 1 6.83333333333333
    Planned Config-
    uration Change
    0 0 30 0 0 40 0 0 1.16666666666667
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Finished acceptance study at about 5am. Spectrometer change to 1.389 GeV required about 40minutes and since 6:00 taking data possibly the last point at this beam energy.

    Data Entry by: Seonho Choi