• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Brash

    Log entry time 23:58:00 on December 11,1998

    Entry number 8252

    keyword=Shift Summary

    Duties completed -->

    did HARP scan along with target polarization measurement - 31.5 % !!
    system checks from 5 PM to 5:30 PM along with Fac. Dev. from 5:30-7:00 pm
    parallel polarization at ..
    did polarization measurement at 10:30 pm - 32.5 % !!
    shift checklist !!

    Note: We did not do the HAPPEX charge asymmetry because
    someone (R. Tieulent ?) logged the parity account off of adaqh3
    in the back room, and nowhere is the password documented, so ....

    News Flash !!

    At 10:45, the network router hub in the MCC control room
    literally starting smoking and burnt up !!!! This caused them
    to lose all of their control screens, and so they hit the 'Oh My God !'
    button and shut things down. No estimate at this point as
    to time to fix.

    Duties for next shift:

    if beam ever returns ...

    Continue parallel and perp. at 1.059 GeV/c, then
    move to 0.832 GeV/c.
    shift checklist
    HAPPEX asymmetry