• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 16:01:46 on December 22, 1998

    Entry number 9162

    keyword=Beam Time Accounting
    Hall A

    12/22/1998 0800-1600
    Experiment #: E94-010
    Shift Leader: F. Sabatie
    Shift Workers: M. Jones, S. Incerti

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    0.5 0.9 0.9 0.9 1 0 .2 0 4.4
    Beam Available
    but Not in Use
    0.25 0 0 0 0 1 .8 0 2.05
    Beam Not Available
    or Unacceptable
    0.25 0.1 0.1 0.1 0 0 0 1 1.55
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    0.75 1 1 1 1 0 .2 1 5.95
    Planned Config-
    uration Change
    0.25 0 0 0 0 0 0 0 0.25
    Unplanned
    Experiment Down
    0 0 0 0 0 1 .8 01.8
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: - // config at 2.423 GeV - NMR done at 8am, gave 35% target polarization - Controlled Access from 1pm to 2:30pm: NMR pol. loss test (Seb) Trigger Latch TDC fixed (Bob) Laser #6 check (Karl) - Harp #6 scan at 2:30pm - Back to data taking at 2:50pm with 27% target polarization - Started tuning for moller measurement at 3pm, but the beam tripped due to an IOC loss. No beam till 4:40pm at least.

    Data Entry by: F. Sabatie