Main INDEX
Monthly INDEX
PREV
NEXT
User name M Jones
Log entry time 10:59:17 on February 3,1999
Entry number 12076
keyword=Finished FPP cosmic runs
Finished FPP cosmic runs. ROC3 was turned off and runcontrol for the
adaqs2 reconfigure in HADRON mode. The HV for the chambers was
turned off and cables disconnected, LV supplies were turned off and
gas flow was cut by half. Main problem is that HV channel 8.1.1 is
ok at 1875 but at 1900 draws 2.2uA .