User name gilman
Log entry time 09:27:27 on February 11,1999
Entry number 13630
keyword=9 AM interruption of production data
Beam goes away about 8:50, hear second hand that there is laser leakage from
A to B. This is 10 minutes early for planned accelerator checks we were warned about.
During this time, Haiyan + JP measure polarization, switch angle to 62.5 from 242.5
degrees... polarization is 35.6%.
With 1 microamp, raster looks ok with spot check.
Accelerator is being krested, so beam might move around. In ~10 minutes,
they should be done, and we can center beam, slowly up current, and start production data again.