• Main INDEX
  • Monthly INDEX
  • NEXT

    User name adaq

    Log entry time 00:01:46 on May 1, 1999

    Entry number 19526

    keyword=Beam Time Accounting
    Hall A

    4/30/1999 1600-2400
    Experiment #: E91-010
    Shift Leader: M.Baylac
    Shift Workers: L.Todor

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    50 30 0 5 15 60 40 15 3.58333333333333
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    10 30 60 55 45 0 20 45 4.41666666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 1 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Raster size still too small in y direction, but no target boiling was seen ( at 50 muA). System checks (between 5:30 and 7:55). Moller measurement done between 8:45 and 10 pm. Crappy night.

    Data Entry by: M.Baylac