7:53 - 8:54: run 1737, last e + d run, 164 k, 107 k T3
8:55 tune beam for 10 minutes
9:10 let Saha do "5 minute" HARP scan check for 15 minutes
9:25 put target back in
9:35 not enough current, 10 minutes beam tuning
9:50, start e+p run 1739 with 11 microA current, stopped 11:00 @ 81 k, 38l T3
11:00 start run 1740, 11 micro A drops to 10 at ~11:30
11:18 Zone drop out beam off couple minutes
11:50: Stop run 1740, 24 of 47 k events are T3s.
Put in radiator and open carbon doors.
11:55 Start run 1741 as check of garbage with no fpp doors in, gamma+p.
Doors open last 1/3 of way / 45 s / first 4.4 k of run.
Take 26 k total events in 6 minutes.
12:00 waiting for access, asked for ep setup to be started during this.
12:30 access complete
13:00 e-p starts
13:45 e-p ends.
13:45 access to BSY . also access to hall to go to 13.5
14:45 Put a little cesium on wafer. May increase current.
more accessers and waiting for beam, no C(e,e') at end of shift