• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Kelly

    Log entry time 19:21:17 on October 2,1999

    Entry number 27482

    keyword=running with Moller setup

    Run 1946 started with smaller spot size than previous runs. We tested whether
    turning fast feedback off affected spot size, but it did not. However, the spot
    size for run 1947 spontaneously returned to 1.5 x 2 mm. During conversation
    with MCC, it was discovered that Moller quads and others in the beam line
    had not been reset properly after the Moller run.

    MCC is now loading the proper settings for normal operation.

    With normal settings, the spot is now 1.5 x 2.5 mm with a familiar, not
    quite rectangular, shape.