    0:01 Oct 11. Start with LD2, 6%radiator, P_h=1.9366,
    theta_h=51.17. (and P_e=1.06, theta_e=59.326) in progress.
    3:05 Completed the LD2 portion of this cycle. Total 0.41 Coul.
    Now switch to 15 cm Hydrogen target, 6% rad, start run 2233
    5:05 Finish run 2235, that completes the above with 0.15 Coul.
    5:07 Take out radiator. Hydrogen target. Run 2236. 0.04 Coul.
    Next cycle will involve the same H-arm settings and a new E-arm
    angle and momentum: P_e=1.408, theta_e=43.57.
    We change the E-arm while taking run 2237(brief) and 2238.
    5:57 E-arm stable. Run 2239 (Rad out, Hyd target). 0.04 C
    6:36 Put 6% radiator in. Hydrogen target. start run 2240.
    7:30 Problems with beam dump (water flow problem)
    End run 2240. Waiting for beam.