1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 45.0 | 0 | 0 | 0 | 15 | 1 | 1 | 1 | 4 |
Beam Available but Not in Use | 0 | 15.0 | 1 | 0 | 0 | 0 | 0 | 0 | 1.25 |
Beam Not Available or Unacceptable | 15.0 | 45 | 0 | 1 | 45 | 0 | 0 | 0 | 2.75 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1.0 | 45.0 | 0 | 1 | 1 | 1 | 1 | 1 | 6.75 |
Planned Config- uration Change | 0 | 15.0 | 1 | 0 | 0 | 0 | 0 | 0 | 1.25 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 45 | 0 | 0 | 0 | 15 | 1 | 1 | 1 | 4 |
Other | 0 | 15 | 1 | 0 | 0 | 0 | 0 | 0 | 1.25 |
Comments: Moller measurement finished at 1645 followed by Accelerator system checks. Then access to move things in the Hall. Trouble getting beam back (MCC forgot to shut off Moller magnets bluie.)
Data Entry by: J. LeRose