Jefferson Lab HALL A Logbook for November 99 - All EXCEPT Automatic Entries
Main INDEX
Tuesday
Monday
Sunday
Tuesday
Monday
Wednesday
Tuesday
Monday
Sunday
Friday
Thursday
30208 11/11/99 17:39 Jack Electron arm VDC -5.2V.
Wednesday
Tuesday
30116 11/09/99 06:15 R. Michaels Comparison of Raster Patterns (summary)
30112 11/09/99 05:50 R. Michaels 47 Hz raster modulation
30110 11/09/99 05:20 R. Michaels oval raster, 1 kHz raster modulation
30106 11/09/99 05:06 R. Michaels run 3094 - circular raster
30096 11/09/99 04:42 R. Michaels raster repaired
30095 11/09/99 02:34 R. Michaels comparison circular / square raster
30094 11/09/99 02:13 R. Michaels raster too small
30088 11/09/99 01:48 R. Michaels run 3087 - circular raster
30084 11/09/99 01:33 R. Michaels raster switch complete
Monday
30081 11/08/99 22:29 R. Michaels summary - square raster tests
30082 11/08/99 22:29 R. Michaels access -- change raster
30079 11/08/99 22:17 R. Michaels Qsq for square raster
30078 11/08/99 22:12 R. Michaels run 3085 - repeat
30075 11/08/99 22:04 R. Michaels run 3084 -- bigger raster
30074 11/08/99 22:03 R. Michaels Qsq result -- square raster
30071 11/08/99 21:52 R. Michaels run 3083 -- square (bigger)
30069 11/08/99 21:47 R. Michaels run 3082 -- square raster
30065 11/08/99 21:34 R. Michaels EPICS screen
30064 11/08/99 21:21 R. Michaels setup for Q^2 measurement
30063 11/08/99 20:39 R. Michaels access to change spectr. angle
30059 11/08/99 19:59 R. Michaels Raster -- Test Plan
30040 11/08/99 14:23 gilman magnet and carbon door screens for ep elastics
30029 11/08/99 00:03 Gayou Swing shift report
Sunday
29999 11/07/99 13:25 gilman ready for 528 MeV
29998 11/07/99 13:24 Saha Current calibration run, Oct 25, 1999
29997 11/07/99 13:07 gilman 528 MeV beam setup screens
29995 11/07/99 07:54 M. Rvachev Owl shift summary
29986 11/07/99 00:03 Fissum Shift summary 11/06/99
Saturday
29970 11/06/99 22:35 x. jiang spectrometer window and carbon door setting at run 3042.
29959 11/06/99 21:10 x. jiang magnet window and fpp window at run 3037
29957 11/06/99 21:01 K. Wijesoori Fpp straw maps for GEP data
29940 11/06/99 18:31 Eugene Moller results
29938 11/06/99 15:53 ransome Shift summary
29932 11/06/99 12:20 ransome injector problems
29929 11/06/99 11:32 ransome beam instability
29927 11/06/99 11:22 Ransome beam off
29922 11/06/99 10:06 ransome CODA problem
29920 11/06/99 09:44 ransome CODA crash
29914 11/06/99 07:59 S. Strauch Owl Shift Summary
Friday
29897 11/05/99 23:55 ransome shift summary
29895 11/05/99 22:28 ransome magnet/carbon screens
29894 11/05/99 22:21 gilman 1.01 GeV hadron setting for d(g,p)n
29893 11/05/99 19:41 Eugene Moller results
29889 11/05/99 15:59 M. Rvachev Shift summary
29887 11/05/99 15:30 M. Rvachev shift summaries
29870 11/05/99 10:34 C. E. Jones FPP HV, doors
29869 11/05/99 10:29 C. E. Jones HV
29868 11/05/99 10:28 C. E. Jones magnet settings
29867 11/05/99 10:17 adaq test
29864 11/05/99 09:26 Kevin Fissum charge asymmetry
29854 11/05/99 07:54 S. Strauch Charge asymmetry
Thursday
29817 11/04/99 18:26 M.Rvachev Charge assymetry
29789 11/04/99 09:46 gilman magnet and carbon door screens for 4.8 Gev data
29776 11/04/99 06:25 S. Strauch No space left on device /adaql1/data1
29773 11/04/99 05:41 S. Strauch Charge Asymmetry
29766 11/04/99 03:36 S. Dieterich Loop 2 ventilator display
29765 11/04/99 00:31 S. Strauch New spectrometer magnets & settings
Wednesday
29722 11/03/99 10:53 gilman e-arm magent stability / Q1 wandering
29712 11/03/99 09:10 gilman magnet / carbon door screen for 60 deg cm
Tuesday
29782 11/02/99 23:37 S. Strauch Owl Shift Summary
29763 11/02/99 22:45 LeRose Beam Energy Change
29762 11/02/99 21:59 LeRose Beam Energy Change
29649 11/02/99 21:31 S.Malov Electron arm Q1 glitches
29663 11/02/99 17:00 S.Malov swing shift summary
29831 11/02/99 16:56 gilman swing shift summary
29734 11/02/99 15:59 LeRose Q1 electron
29624 11/02/99 15:30 Glamazdin Moller results
29620 11/02/99 14:16 gilman magnet / fpp door screens for 90 deg cm
29631 11/02/99 13:10 gilman day shift summary
29614 11/02/99 12:40 mitchell data integrity:charge asymm
29587 11/02/99 09:00 gilman screens for 120 deg cm gam p -> p pi0
29810 11/02/99 08:08 S.Malov day shift summary
29578 11/02/99 07:59 Kumbartzki owl shift summary
29726 11/02/99 07:52 gilman day shift summary
29552 11/02/99 04:00 x. jiang run 2859. e-arm single run
29549 11/02/99 03:50 x. jiang spectrometer window and fpp window at run 2859.
29545 11/02/99 02:58 x. jiang spectrometer window, during run 2856.
29858 11/02/99 00:06 S. Strauch Owl Shift Summary
29704 11/02/99 00:02 Kumbartzki owl shift summary
Monday
29520 11/01/99 16:03 gilman/jpche day shift summary
29508 11/01/99 11:31 R. Michaels convenient links to data files
29506 11/01/99 11:19 R. Michaels bad disk
29504 11/01/99 11:00 K. Wijesoori down time
29499 11/01/99 07:27 Kumbartzki owl shift summary
29486 11/01/99 00:06 x. jiang shift activity.