PREX   Heating and Cooling Controls

Purpose:   To maintain a more constant temperature on the O-ring connection after the Pb/D target.   The idea is to minimize the swing in temperature between beam on and beam off.   This will reduce thermal cycling which threatens to break the seal.

Update:   May 27, 2010.