Instrumentation, Controls, Detector, and DAQ related things that
have been done in Halls A and C
General Tasks of Note
That Have Been Completed
- Assembled manifold for C4F8 for GRINCH in the hall
- Swapped right and left N2 lines to pneumatic valves on Ar/CO2
pre-mix cylinder controller
- Replaced pneumatic valve on right Argon cylinder for Hall A
- Setup controls9 (Ellen)
- Replaced power cord on battery charger in golf car 24 (Ellen)
- Replaced batteries in SHMS UPS (Ellen)
- Get NMR signals from HMS NMR to counting room (Ellen)
- Installed VVU on SBB power supply (Joe)
- Moved HMS and SBS equipment back to UPS power
- Determine N2 100% liquid level set point for Hall C magnets (Heidi)
- Installed new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).(Heidi)