Main INDEX
Monthly INDEX
PREV
NEXT
User name brads
Log entry time 22:45:44 on August 6,2006
Entry number 177797
Followups:
keyword=Huge beam position excursion -- connected to target heater failure
Huge beam position excursion (6mm in y). The target heater on loop 2 (LH2 target) failed at the same time (see other log entry).
Everything seems OK now.
FIGURE 1