User name hyao
Log entry time 08:16:46 on August 7,2006
Entry number 177931
keyword=Owl Shift/Run Summary
Shift Summary
--------------
00:00 shift started with beam permit
01:35 Target changed to LD2 15cm-->Production
01:57 change prescale 3 from 1 to 3, pre4 from 5000 to 7000
02:18 Start LD2 productions run
03:21 Move target to optics
03:22 Move spectrometer to 39.51deg
Leftarm P=0.6284
03:55 Start pointing measurement
04:08 Target moved to 4cm dummy
04:26 Target moved to 7cm dummy
04:43 Target moved to tantalum
05:07 Target moved to LH2 15cm
05:45 Start rate check tests
06:12 Target moved to LD2 15cm
06:58 Start Production Run
08:16 Shift end
Run Summary
------------
2234 LH2 15cm 1.95M
2235 LH2 15cm 1.95M
2236 LH2 15cm 1.95M
2237 LH2 15cm 1.95M
2238 LH2 15cm 1.95M
2239 Junk
2240 LD2 15cm 1.95M
2241 LD2 15cm 1.95M
2242 LD2 15cm 1.95M
----
Point Measurement
2243 Optics 0.2M
2244 4cm Dummy 0.5M
2245 7cm Dummy 0.5M
2246 Tantalum 62k
-----
Rate check
2247 LH2 15cm 0.2M Rad5
2248 LH2 15cm 0.4M Rad5
2249 LH2 15cm 0.1M Radout
2250 junk
2251 LD2 15cm 0.6M Radout
2252 junk
2253 LD2 15cm 0.2M Rad 5%
------
Production
2254 LD2 15cm 1.95M Rad 5%
2255 LD2 15cm 1.95M Rad 5%
2256 LD2 15cm 1.95M Rad 5%
2257 LD2 15cm 1.95M Rad 5%
2258 LD2 15cm 1.95M Rad 5%
2259 LD2 15cm running Rad 5%