    Log entry time 08:16:46 on August 7,2006

    Entry number 177931

    keyword=Owl Shift/Run Summary

    Shift Summary
    --------------
    00:00 shift started with beam permit
    01:35 Target changed to LD2 15cm-->Production
    01:57 change prescale 3 from 1 to 3, pre4 from 5000 to 7000
    02:18 Start LD2 productions run
    03:21 Move target to optics
    03:22 Move spectrometer to 39.51deg
    Leftarm P=0.6284
    03:55 Start pointing measurement
    04:08 Target moved to 4cm dummy
    04:26 Target moved to 7cm dummy
    04:43 Target moved to tantalum
    05:07 Target moved to LH2 15cm
    05:45 Start rate check tests
    06:12 Target moved to LD2 15cm
    06:58 Start Production Run
    08:16 Shift end


    Run Summary
    ------------
    2234 LH2 15cm 1.95M
    2235 LH2 15cm 1.95M
    2236 LH2 15cm 1.95M
    2237 LH2 15cm 1.95M
    2238 LH2 15cm 1.95M
    2239 Junk
    2240 LD2 15cm 1.95M
    2241 LD2 15cm 1.95M
    2242 LD2 15cm 1.95M
    ----
    Point Measurement
    2243 Optics 0.2M
    2244 4cm Dummy 0.5M
    2245 7cm Dummy 0.5M
    2246 Tantalum 62k
    -----
    Rate check
    2247 LH2 15cm 0.2M Rad5
    2248 LH2 15cm 0.4M Rad5
    2249 LH2 15cm 0.1M Radout
    2250 junk
    2251 LD2 15cm 0.6M Radout
    2252 junk
    2253 LD2 15cm 0.2M Rad 5%
    ------
    Production
    2254 LD2 15cm 1.95M Rad 5%
    2255 LD2 15cm 1.95M Rad 5%
    2256 LD2 15cm 1.95M Rad 5%
    2257 LD2 15cm 1.95M Rad 5%
    2258 LD2 15cm 1.95M Rad 5%
    2259 LD2 15cm running Rad 5%