16:00 start with 9.5M, LD2, radiator out
16:15 next runs might have large beam asymmetries due to tests of electron polarization measurments
Runs:
2361/20771 - 2365/20775 LD2, Radiator out, Polarization Measurments=>Large Beam Asymmetry
17:05 MCC called, problems with the BSY, they cannot deliver beam to two halls simultaneously
17:15 re-started current feed back
17:35 beam back continue with initial program:
17:50 lost beam, problem with a switchyard magnet
19:40 prepare for Bulls Eye scan.
20:00 first scan->postbone for later, switch to LH2, rad.out
21:00 put radiator into beam
23:00 no LN2 in Q1 right-> turn it off -> no data taking
23:30
Run, Events(M), Total(M), Setup
2366/20776, 0.86, 10.3, LD2, Rad. out,
2367/20777, 1.95, 12.25
2368/20778, 1.95, 14.2
2369/20779, 1.95, 16.1
2371/207781, 0.2, 0.2 LH2 Rad out
2372/207782, 1.95, 1.95 KH2 Rad.in
207783
2373/207784, 1.95, 3.9
2374/207785, 1,95, 5.85 end of measurment