User name Boeglin
Log entry time 16:01:42 on August 9,2006
Entry number 178685
keyword=Shift Summary
8:00 continue data on LD2 with radiator in
10:05 beam stopped. Hall will be put in controlled access
10:55 MCC called, Hall ready for access
Spectrometer back at its place
Electronic work finished: redundant helicity measurements and checks added
13:50 Hall Closed, ask for beam permit, prepare for Bull's Eye scan
14:30 start harp scans
15:25 Harp scanner B fails revert to normal pointing run
Run, Events, Total, Setup
2406/20815, 1.95, 36, LD2 rad. in
2407/20815, 1.95, 37.9, "
2408/20815, 1.95, 39.85, "
2409/20815, 1.95, 41.8, "
2410/20816, 1.95, 43.75, "
2411/20817, 1.95, 45.7, "
2412/20818, 1.95, 47.65, "
Harp scans:
Position, Harp run, Coda runs
(0,0), 2247, 2425/20820
A(0.9,0.9)
B(0.,0.) 2248, 2426/20821 (end of run at wrong position)
A(-.6,.2)
B(-2.,-2.) 2249, 2427/20822
Mini-Pointing runs
2429 pointing at 5uA carbon
2430 pointing at 20uA
2431 pointing, Dummy 4cm