    User name Meral

    Log entry time 00:01:30 on August14,2006

    Entry number 179732

    keyword=Swing Shift/Run Summary

    Shift Summary
    16:00- Kinematics Point 19 Production Runs, LD2, 5%
    18:34- called for recentering of BPM
    18:42- MCC is having problems with magnet, no beam for 15 minutes
    19:09- Tuned beam
    19:11- beam is back
    19:38- no beam, MCC doing a PCT check
    19:55- beam is back
    21:43- asked MCC to recenter bpm again
    22:02- right arm CODA needed to be rebooted

    Run Summary
    Run Num Num Events,Total Current
    2647/20994 1.9M 10uA, Production Runs, (approx 16 min)
    2648/20995 1.9M, 3.8M 10uA
    2649/20996 1.9M, 5.7M 10uA
    2650/20997 1.9M, 7.6M 10uA
    2651/20998 1.9M, 9.5M 10uA
    2652/20999 1.9M, 11.4M 10uA
    2653/21000 1.9M, 13.3M 10uA
    2654/21001 1.9M, 15.2M 10uA
    2655/21002 1.9M, 17.1M 10uA
    2656/21003 1.9M, 19M 10uA
    2657/21004 1.9M, 20.9M 10uA
    2658/21005 1.9M, 22.8M 10uA
    2659/21006 1.9M, 24.7M 10uA
    2660/21007 1.9M, 26.6M 10uA
    2661/21008 1.8M, 28.4M 10uA, MCC had a problem ended early
    2662/21009 1.9M, 30.3M 10uA
    2663/21010 1.5M, 31.8M 10uA, MCC running PCT
    2664/21011 1.9M, 33.7M 10uA
    2665/21012 1.9M, 35.6M 10uA
    2666/21013 1.9M, 37.5M 10uA
    2667/21014 1.9M, 39.4M 10uA
    2668/21015 1.9M, 41.3M 10uA
    2669/21016 1.9M, 43.2M 10uA
    2670/2671/21017- junk, coda failed
    2672/21018 1.9M, 45.1M 10uA
    2673/21019 1.9M, 47M 10uA
    2674/21020 1.9M, 48.9M 10uA
    2675/21021 1.9M, 50.8M 10uA
    2676/21022 1.9M, 52.7M 10uA
    2677/21023 1.9M, 54.6M 10uA
    2678/21024 1.9M, 56.5M 10uA
    2679/21025 1.9M, 58.4M 10uA
    2680/21026 in process