NEXT
User name r gilman
Log entry time 12:27:21 on August31,2006
Entry number 184101
keyword=day shift summary
Beam restored about 8:16 AM after Wien angle change and Mott measurement. Restart program of radiator in on hydrogen to finish up statistics.
th_l=103.4 deg, p_l=496.1 MeV/c, th_r=24.0 deg, p_l=346.0 MeV/c
Raster is about 4 mm high by 2.5 mm wide.
Runs I(uA) tgt rad Notes
3652/21914 12.5 LH2 5% 1M/7.6M
3653/21915 12.5 LH2 5% 1M/7.4M
3654/21916 12.5 LH2 5% 1M/7.5M
Joe Grames in elog 1336239 reports Mott measurements of
P = 80.6 - 85.1 %.
Controlled access to hall to open 3/4" carbon doors.
See ~1 mr/hr near beam calorimeter.
On exit, do 0.1 uA beam calorimeter calibration.
runs 3655/21917 are beam calorimeter runs.
Changing angle requires from about 10:30 to 11:20 to move
from 104 to 14 degrees.
run 21918: 10 uA right arm sieve slit data, while HRSL continues to move.
runs 3656/21918: 10 uA on LD2, raster on
runs 3657/21919: 10 uA on LD2, raster on
Note a few minutes before end of beam that radiator temperatre is reading high. Cause unknown, see separate halogs.
start a cosmic run, 3658, with ps3=1, for FPP