Search results

From Hall A Wiki
Jump to: navigation, search
  • == NEW as of 11/18/08: Production Run Plan, Xiaodong Jiang ==
    5 KB (642 words) - 12:57, 18 November 2008
  • ...front sieve slit plate, design drawing and a picture, as of 07/08/2008. X. Jiang]
    5 KB (828 words) - 06:51, 21 March 2017
  • == Commissioning Part, updated 10/24/08 X. Jiang == 1.2 !!!Dropped OUT, X. Jiang 10/22/08!!! Compton detector initial check.
    26 KB (3,844 words) - 17:56, 24 October 2008
  • Xiaodong Jiang 07/21/2008, (Xiaodong Jiang + J.-P. Chen with MCC).
    16 KB (2,107 words) - 13:09, 25 July 2008
  • == Commissioning Part, updated 10/24/08 X. Jiang == 1.2 !!!Dropped OUT, X. Jiang 10/22/08!!! Compton detector initial check.
    26 KB (3,844 words) - 18:54, 24 October 2008
  • (updated 10/25/2008, Xiaodong Jiang.) 1.2 !!!Dropped OUT, X. Jiang 10/22/08!!! Compton detector initial check.
    32 KB (4,723 words) - 23:00, 2 November 2008
  • ** Analysis block diagram (Jiang) [[Media:transn_collaboration_meet_052209-Jiang.pdf]]
    4 KB (471 words) - 14:07, 29 December 2012
\n