Revision history of "Spectrometer Optics 2014"

From Hall A Wiki
Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 18:05, 2 February 2015Vasulk (Talk | contribs). . (3,616 bytes) (+3,616). . (New page: ==== Procedure with Sieve-slit ==== * Time estimate: 2-3 hours * A Hall A Tech may be required to install the 2-inch lead sieve-slit collimator onto the front face of the HRS. * Take a ...)