Difference between revisions of "Wednesday, March 30, 10:00 AM EDT"

From Hall A Wiki
Jump to: navigation, search
Line 4: Line 4:
 
# Beam monitoring (Mark)
 
# Beam monitoring (Mark)
 
## Background material [http://www.jlab.org/~pitt/telecon_talks/beam_monitoring_telecon_mar_30.pdf Beam monitoring info]
 
## Background material [http://www.jlab.org/~pitt/telecon_talks/beam_monitoring_telecon_mar_30.pdf Beam monitoring info]
## R&D plan
+
## Beam size monitor with cavities (Mike Woods, SLAC, KK mentioned this)
 +
## Beam monitor parasitic development work (KK potentially has graduate student available for this)
 +
## R&D plan needs to focus primarily on charge monitoring - how to proceed?  (ie. parasitic work in Hall A or C or both?  Qweak may be resistant to changes since things are working at an acceptable level now,
 +
but that is not confirmed.)
 
# Tracking (Mark, David A.)
 
# Tracking (Mark, David A.)
 
## Background: Director's Review Tracking Talk (see slides *,*,*) [http://www.jlab.org/~pitt/telecon_talks/TrackingDirectors_armstrong.pdf Tracking background info]
 
## Background: Director's Review Tracking Talk (see slides *,*,*) [http://www.jlab.org/~pitt/telecon_talks/TrackingDirectors_armstrong.pdf Tracking background info]

Revision as of 08:22, 30 March 2011

Agenda

Note: agenda is still being edited

  1. General goals for this "supergroup" (Mark/KK)
  2. Beam monitoring (Mark)
    1. Background material Beam monitoring info
    2. Beam size monitor with cavities (Mike Woods, SLAC, KK mentioned this)
    3. Beam monitor parasitic development work (KK potentially has graduate student available for this)
    4. R&D plan needs to focus primarily on charge monitoring - how to proceed? (ie. parasitic work in Hall A or C or both? Qweak may be resistant to changes since things are working at an acceptable level now,

but that is not confirmed.)

  1. Tracking (Mark, David A.)
    1. Background: Director's Review Tracking Talk (see slides *,*,*) Tracking background info
    2. Background: Initial CAD layout from Dec. 2010 KK talk Tracking CAD info
    3. Background: Small acceptance pion counting detector from Souder Dec. 2010 talk Souder pion detector info
    4. Issues
  2. Integrating detectors (Mark, Michael, Dave M.)
    1. Background: Director's Review Integrating Detectors Talk (see slides *,*,*) Integrating Detectors info
    2. Background: Initial CAD layout from Dec. 2010 KK talk Detectors CAD info
    3. Issues
  3. Next meeting time/goals



Return to MOLLER at 11 GeV E09-005