Difference between revisions of "G2p"

From Hall A Wiki
Jump to: navigation, search
(Technotes)
(Technotes)
Line 58: Line 58:
  
 
==Technotes==
 
==Technotes==
E08-027 technical docs to be posted here...
+
    E08-027 technical docs to be posted here...
  
 
==Mailing List==
 
==Mailing List==

Revision as of 18:39, 15 June 2011

The g2p Experiment

Collaboration Meetings

July 11-22, 2011 Tentative date of next meeting

May 6, 2011 (Readiness Review) (Final Report)

April 18, 2011 (minutes)

Feb. 4, 2011

Sep. 30, 2010 (minutes)

Spectrometer Optics

Analysis

Analysis elog

The regular g2p analysis meetings are Wednesday at 2:30 in F227.

Polarized Target


Runplan/Schedule

Replay

  • Replay info to be posted here...

Saftey Documentation

Saftey is the key

Talks and Presentations

2011 NSTAR, K. Slifer (pdf)

2011 Hall A Workshop, K. Slifer (ppt)

2010 One Slide Summary ppt

Technotes

   E08-027 technical docs to be posted here...

Mailing List

There are two mailing lists relevant to g2p:

  • g2p@jlab.org : General announcements
  • g2p_ana@jlab.org : Weekly analysis

You can subscribe to both at http://mailman.jlab.org

Help