Line 3: Line 3:
 
*** The first cell has not been filled due to some complications in the gas system. The second cell is not delivered and won't be until the first one is filled. Alan is working on oven bottom piece.
 
*** The first cell has not been filled due to some complications in the gas system. The second cell is not delivered and won't be until the first one is filled. Alan is working on oven bottom piece.
 
** temperature optimization test (all)
 
** temperature optimization test (all)
*** redid 230 spin down, did 225 spin down (zhiwen)
+
*** Did the Q-curve for water calibration
 +
*** Did the sensitivity test of Lock—in and linear magnifying quality of preamplifier, Chunhua will compare measured data (Jie, Chunhua)
 
*** Checked fitting with error estimation, in preparation for notes (Chunhua)
 
*** Checked fitting with error estimation, in preparation for notes (Chunhua)
*** water calibration is in progress, Chunhua is calculating flux (Jie, Chunhua)
 
 
** pulse NMR (all)
 
** pulse NMR (all)
*** recorded down the current NMR setup, in preparation for pNMR setup. (Jie)
+
*** Jie wrote the labview program for DAQ (Jie)
*** Jie is writing labview program for DAQ (Jie)
+
** Diffusion mode measurement (all)
** convection flow study (all)
+
*** Made the zapper coil (Chunhua)
*** 2 heater is tested. (Jie)
+
*** installed two new RTD lines. (Jie, Chunhua)
+
** transfer tube wall measurement (Jie)
+
*** did the measurement,refer to [[Polhe3 cell wall thickness measurement]]
+
  
  
Line 26: Line 22:
 
|  align="center" colspan="4" | new cell and oven bottom piece
 
|  align="center" colspan="4" | new cell and oven bottom piece
 
|-
 
|-
| 9/7-9/21
+
| 9/21-10/5
 
| receiving and check fitting  
 
| receiving and check fitting  
 
| all
 
| all
Line 33: Line 29:
 
|  align="center" colspan="4" | diffusion mode measurement
 
|  align="center" colspan="4" | diffusion mode measurement
 
|-
 
|-
| 9/7-9/14
+
| 9/21-10/5
| make a zapper coil or a pair of coils to confine field better
+
| Chunhua
+
|
+
|-
+
| 9/7-9/14
+
 
| do the test  
 
| do the test  
 
| all
 
| all
Line 45: Line 36:
 
|  align="center" colspan="4" | convection flow study
 
|  align="center" colspan="4" | convection flow study
 
|-
 
|-
| 9/7-9/14
+
| 9/21-10/5
 
| make a zapper coil or a pair of coils to confine field better
 
| make a zapper coil or a pair of coils to confine field better
 
| Chunhua
 
| Chunhua
 
|
 
|
 
|-
 
|-
| 9/7-9/14
+
| 9/21-10/5
 
| do calibration on old and new RTD. connect RTD readout/control in labview
 
| do calibration on old and new RTD. connect RTD readout/control in labview
 
| Jie
 
| Jie
Line 57: Line 48:
 
|  align="center" colspan="4" | temperature optimization test  
 
|  align="center" colspan="4" | temperature optimization test  
 
|-  
 
|-  
| 9/7-9/14
+
| 9/21-10/05
| do Q-curve measurement, and finalize water cell calibration.
+
| find a removable pick-up coil to do another water calibration for future NMR test
 
| all
 
| all
 
|-
 
|-
| 9/7-9/21
+
| 9/21-10/05
 
| improve analysis, check fitting with error estimation and prepare plots for a note.
 
| improve analysis, check fitting with error estimation and prepare plots for a note.
 
| Chunhua
 
| Chunhua
Line 68: Line 59:
 
| align="center" colspan="4" | pulse NMR
 
| align="center" colspan="4" | pulse NMR
 
|-
 
|-
| 9/7-9/21
+
| 9/21-10/05
| pNMR setup. test the transmitter circuit and receiver circuit separately. combine them once diffusion mode test is finished. Write the labview program and make a test
+
| pNMR setup and test  
 
| Jie
 
| Jie
 
|
 
|
 
|-
 
|-
| 9/7-9/21
+
| 9/21-10/05
 
| find or make coil and test it with capacitor matchbox  
 
| find or make coil and test it with capacitor matchbox  
 
| Chunhua
 
| Chunhua
|
 
|-
 
| 9/7-9/21
 
| do a test
 
| all
 
 
|
 
|
 
|}
 
|}

Revision as of 09:20, 25 September 2011

  • progress
    • new cell and oven bottom piece (zhiwen)
      • The first cell has not been filled due to some complications in the gas system. The second cell is not delivered and won't be until the first one is filled. Alan is working on oven bottom piece.
    • temperature optimization test (all)
      • Did the Q-curve for water calibration
      • Did the sensitivity test of Lock—in and linear magnifying quality of preamplifier, Chunhua will compare measured data (Jie, Chunhua)
      • Checked fitting with error estimation, in preparation for notes (Chunhua)
    • pulse NMR (all)
      • Jie wrote the labview program for DAQ (Jie)
    • Diffusion mode measurement (all)
      • Made the zapper coil (Chunhua)


  • Calendar
timeline Tasks To be done by status
new cell and oven bottom piece
9/21-10/5 receiving and check fitting all
diffusion mode measurement
9/21-10/5 do the test all
convection flow study
9/21-10/5 make a zapper coil or a pair of coils to confine field better Chunhua
9/21-10/5 do calibration on old and new RTD. connect RTD readout/control in labview Jie
temperature optimization test
9/21-10/05 find a removable pick-up coil to do another water calibration for future NMR test all
9/21-10/05 improve analysis, check fitting with error estimation and prepare plots for a note. Chunhua
pulse NMR
9/21-10/05 pNMR setup and test Jie
9/21-10/05 find or make coil and test it with capacitor matchbox Chunhua